SBH Shoring

SBH trench shoring

Trench Shoring Products – Box Shoring - Drag Box Series 650

The Drag Box is designed for trench shoring constructions outside the city and for stable soils. It secures only a small section for the laying of the pipes. The front ends remain unshored and have to be sloped according to soil conditions.



The further excavation is effected ahead and the trench drag box is pulled through the excavated trench into the new working position. Filling and compacting is done behind the drag box whereas the pipe can be layed under protection of the trench shoring plates.

Recommended

  • outside the city
  • without crossing lines
  • outside the sphere of buildings and structures
  • outside the sphere of traffic zones and endangered cables
  • for temporarily stable soils
  • for dry soils
  • for mechanical compacting from above
  • if settlements are acceptable
max. installation depth:bis 3,00m
Trench width:1,15 - 6,15m
Strut clearance height (hc):1,85m
Mobile and chain excavator:30 - 50t
Schleppbox SBH

Purchase / Rental

Call us for free and we will inform you how you can rent our trench shoring equipment or even buy.

RENT HOTLINE:
+49 2452 9104-0